Klang Valley MRT Project, Malaysia – Turnkey System Design and Specifications
[2010 – ] ADC, as the railway system consultant to MMC-Gamuda JV, is responsible for the Proposal to the Government, scheme design, preparation of specifications, advice on procurement strategy, system works programme, life cycle costing, formulation of operations and maintenance strategy of the railway system works including rolling stock, signalling, trackworks, fare collection system, telecommunication systems, power and distribution system, depot and maintenance equipment, tunnel ventilation system, access control system, SCADA, platform screen doors of the Klang Valley MRT.
The KV MRT consists of three lines with 94 stations, five train depots and over 140 km total route length, intended to serve the greater KL areas. The estimated project cost, including rolling stock and lands, is about 43 billion MYR.
 |
|
|