Washington DC Dulles Airport APM
[2008 – 2010] ADC undertook the systems integrator role in supporting MHI on the testing and commissioning, integration, technical issue investigations and failure analysis of the signalling and train control system of the Washington Dulles Airport APM Project - AeroTrain. The initial phase of the AeroTrain included 8 km of underground guideway, four stations, and an offline maintenance facility positioned for future expansion and a fleet of 29 vehicles. The estimated cost of the project was about 1.3 billion USD.
 |
|
|